CUSA CONSULTING LLC
- UEI
- E2W6TRUP2FA8
- Land
- 🇺🇸 Verenigde Staten · HAMPTON (038421970)
- Gewonnen opdrachten
- 852
- Totale contractwaarde
- 92 082 748 USD
- Eerste opdracht
- 13/10/2017
- Laatste opdracht
- 20/09/2022
Top 5 · Publieke aanbesteders
- Department of Transportation - Federal Aviation Administration 🇺🇸 849 gewonnen opdrachten
- Department of Transportation - Immediate Office of the Secretary of Transportation 🇺🇸 3 gewonnen opdrachten
CUSA CONSULTING LLC heeft 852 overheidsopdrachten gewonnen die op Tendervue zijn geindexeerd. Bekijk hieronder de volledige lijst van aanbestedingen, publieke aanbesteders, CPV/PSC-categorieen en gegunde bedragen aan CUSA CONSULTING LLC.
Active 2017-2022
2 buyers
852 contracts
Gunningen (852)
| Datum | Aanbesteder | Omschrijving | Bedrag | Procedure |
|---|---|---|---|---|
| 20/09/2022 | Department of Transportation - Federal Aviation Administration | ELECTRICAL LINE DISTRIBUTION DESIGN & INSTALLATION AT FORT LAUDERDALE, FL (FXE) MALSR | 22 362 USD | FIRM FIXED PRICE |
| 15/09/2022 | Department of Transportation - Federal Aviation Administration | INSTALLATION COST FOR ELECTRICAL LINE DISTRIBUTION PROJECT AT ISLIP, NY - ISP ELD | 130 493 USD | FIRM FIXED PRICE |
| 14/09/2022 | Department of Transportation - Federal Aviation Administration | ELD UPGRADE INSTALLATION AT SYRACUSE, NY (SYR) ELD | 4 467 USD | FIRM FIXED PRICE |
| 12/09/2022 | Department of Transportation - Federal Aviation Administration | ELECTRICAL LINE DISTRIBUTION DESIGN & INSTALLATION AT FORT LAUDERDALE, FL (FXE) MALSR | 38 512 USD | FIRM FIXED PRICE |
| 29/08/2022 | Department of Transportation - Federal Aviation Administration | CHANGE ORDER FOR STEWART ARPT, NY (SWFC) ATCT FOR COST INCREASES ASSOCIATED WITH COVID-19 AND CONSTRUCTION DELAYS DUE TO PA, NY, AND NJ REVIEW PROCESS. JCN #: 1503733 | 9 086 USD | FIRM FIXED PRICE |
| 24/08/2022 | Department of Transportation - Federal Aviation Administration | FST CHANGE ORDER FOR SITE SPECIFIC GEOTECHNICAL ANALYSIS CONDUCTED DURING THE DESIGN PHASE TO COMPLY WITH MASS PORT COMPLIANCE REQUIREMENTS AT BOSTON, MA (BOSC) JCN: 1502971, REFERENCE TO #: 6973GH-21... | 21 581 USD | FIRM FIXED PRICE |
| 15/08/2022 | Department of Transportation - Federal Aviation Administration | CONSTRUCTION COST OF UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AND ERMS WINDSOR LOCKS CT, BDL ATCT | 198 541 USD | FIRM FIXED PRICE |
| 11/08/2022 | Department of Transportation - Federal Aviation Administration | ADDITIONAL INSTALLATION FUNDS FOR HPNC | 23 847 USD | FIRM FIXED PRICE |
| 11/08/2022 | Department of Transportation - Federal Aviation Administration | FLOOR DRILLING AND TAPPING EXHAUST BRACKET CHANGES ROCHESTER GAUGE PROVIDE AND INSTALL ENVIRONMENT CONTROL PANEL CHANGES AND REWIRE PROVIDE AND INSTALL DOUBLE THROW NEUTRAL KIT | 6 007 USD | FIRM FIXED PRICE |
| 05/08/2022 | Department of Transportation - Federal Aviation Administration | DESIGN FOR ELD PROGRAM OFFICE AT ST CROIX, VI (STX) ELD | 140 992 USD | FIRM FIXED PRICE |
| 05/08/2022 | Department of Transportation - Federal Aviation Administration | DESIGN FOR ELD PROGRAM OFFICE AT MANASSAS, VA (HEF) ELD | 39 036 USD | FIRM FIXED PRICE |
| 01/08/2022 | Department of Transportation - Federal Aviation Administration | DE OBLIGATION - NO LONGER ACTIVE | 0 USD | FIRM FIXED PRICE |
| 22/07/2022 | Department of Transportation - Federal Aviation Administration | SITE SURVEY TRAVEL COST FOR ELECTRICAL LINE DISTRIBUTION PROJECT AT SAIPAN OBYAN, CQ | 13 224 USD | FIRM FIXED PRICE |
| 21/07/2022 | Department of Transportation - Federal Aviation Administration | CHANGE ORDER FOR ADDITIONAL CONCRETE REPLACEMENT DUE TO EROSION PER CUSA PROPOSAL DATED 6-29-2022 AT DALLAS FT WORTH, TX (DFWF) ATCT, JCN: 1500559 | 9 954 USD | FIRM FIXED PRICE |
| 12/07/2022 | Department of Transportation - Federal Aviation Administration | BOSE ADDITIONAL INSTALLATION & ERMS FUNDS | 41 285 USD | FIRM FIXED PRICE |
| 11/07/2022 | Department of Transportation - Federal Aviation Administration | DE-OBLIGATION FOR THE GROUNDING | -3 834 USD | FIRM FIXED PRICE |
| 07/07/2022 | Department of Transportation - Federal Aviation Administration | BIL UPS CONSTRUCTION COST THIS ACQUISITION IS TO HIRE A CONTRACTOR TO INSTALL (2) UPS 9395 225 KVA 480/480V, (1) UPS 9390 80 KVA 480/480V, (5) BATTERY BREAKER ENCLOSURES, AND BATTERY INSTALLATION 9HR3... | 199 914 USD | FIRM FIXED PRICE |
| 01/07/2022 | Department of Transportation - Federal Aviation Administration | SJU ELD & SOLAR DESIGN PROPOSAL | 184 046 USD | FIRM FIXED PRICE |
| 10/06/2022 | Department of Transportation - Federal Aviation Administration | CHANGE ORDER REPLACE EXISTING EXHAUST FAN, DAMPER , UNIT HEATER & WALL MOUNTED THERMOSTAT | 23 393 USD | FIRM FIXED PRICE |
| 09/06/2022 | Department of Transportation - Federal Aviation Administration | ELECTRICAL LINE DISTRIBUTION INSTALLATION AT FORT LAUDERDALE, FL (FXE) MALSR | 803 812 USD | FIRM FIXED PRICE |