ADAPT CONSULTING LLC
- UEI
- EELLK5H9HSG8
- Land
- 🇺🇸 Verenigde Staten · SALT LAKE CITY (841154280)
- Gewonnen opdrachten
- 54
- Totale contractwaarde
- 6 373 320 USD
- Eerste opdracht
- 09/05/2018
- Laatste opdracht
- 30/09/2022
Top 5 · Publieke aanbesteders
- General Services Administration - Public Buildings Service 🇺🇸 13 gewonnen opdrachten
- Department of Transportation - Federal Aviation Administration 🇺🇸 13 gewonnen opdrachten
- Department of Agriculture - Agricultural Research Service 🇺🇸 10 gewonnen opdrachten
- Department of Agriculture - Forest Service 🇺🇸 9 gewonnen opdrachten
- Department of the Interior - Bureau of Reclamation 🇺🇸 8 gewonnen opdrachten
ADAPT CONSULTING LLC heeft 54 overheidsopdrachten gewonnen die op Tendervue zijn geindexeerd. Bekijk hieronder de volledige lijst van aanbestedingen, publieke aanbesteders, CPV/PSC-categorieen en gegunde bedragen aan ADAPT CONSULTING LLC.
Active 2018-2022
6 buyers
54 contracts
Gunningen (54)
| Datum | Aanbesteder | Omschrijving | Bedrag | Procedure |
|---|---|---|---|---|
| 30/09/2022 | Department of Agriculture - Forest Service | RECONSTRUCTION OF TIMBER CREEK HORSE CAMP. | 1 672 122 USD | FIRM FIXED PRICE |
| 28/09/2022 | Department of Agriculture - Forest Service | GAOA LUCERNE CAMPGROUND GROUP SITE RECONSTRUCTION ASHLEY NATIONAL FOREST DUE TO AN ADMINISTRATIVE ERROR MADE BY THE CONTRACTING OFFICER, CONTRACT NUMBER 1240LT22C0089 IS TERMINATED FOR CONVENIENCE OF... | -4 654 561 USD | FIRM FIXED PRICE |
| 27/09/2022 | Department of Agriculture - Forest Service | GAOA LUCERNE CAMPGROUND GROUP SITE RECONSTRUCTION ASHLEY NATIONAL FOREST | 4 654 561 USD | FIRM FIXED PRICE |
| 26/09/2022 | Department of Agriculture - Forest Service | CORONADO - LOWELL HOUSE ASSESSMENT AND DESIGN | 33 000 USD | FIRM FIXED PRICE |
| 20/09/2022 | Department of Transportation - Federal Aviation Administration | CONSTRUCT MAINTENANCE STORAGE BUILDING (PRE-ENGINEERED STRUCTURE) AT THE SALT LAKE CITY AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) | 1 067 763 USD | FIRM FIXED PRICE |
| 01/09/2022 | Department of Transportation - Federal Aviation Administration | CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL AND SUPERVISION FOR REPLACEMENT OF A KITCHEN EXHAUST AT THE SALT LAKE CITY ARTCC. ALL WORK SHALL BE IN ACCORDANCE WITH FAA SOW, SPECIFICATIONS, DRAWINGS, WAGE... | 24 730 USD | FIRM FIXED PRICE |
| 01/09/2022 | Department of Transportation - Federal Aviation Administration | MODERNIZE ADA ACCESSIBILITY FOR THE AVIATION DEVELOPMENT PROGRAM SALT LAKE CITY ARTCC LAKE CITY, UTAH AND CCF | 0 USD | FIRM FIXED PRICE |
| 30/08/2022 | Department of Agriculture - Forest Service | GAOA ANTELOPE FLAT CAMPGROUND WATERLINE REPLACEMENT PROJECT ASHLEY NATIONAL FOREST THE PURPOSE OF THIS MODIFICATION IS TO ADD AN ADDITIONAL $15,486.86 TO THE CONTRACT FOR THE ADDITION OF AN AIR VAC V... | 15 487 USD | FIRM FIXED PRICE |
| 15/08/2022 | Department of Transportation - Federal Aviation Administration | MODERNIZE ADA ACCESSIBILITY FOR THE AVIATION DEVELOPMENT PROGRAM SALT LAKE CITY ARTCC LAKE CITY, UTAH AND CCF | 499 230 USD | FIRM FIXED PRICE |
| 04/08/2022 | Department of Transportation - Federal Aviation Administration | PROVIDE A ONETIME 5-YEAR INSPECTION AND TESTING OF THE FIRE SPRINKLER SYSTEM, FIRE STANDPIPE AND HOSE SYSTEM, UNDERGROUND PRIVATE FIRE SERVICE MAIN AND FIRE WATER STORAGE TANK SYSTEM. IT INCLUDES THE ... | 21 225 USD | FIRM FIXED PRICE |
| 01/08/2022 | Department of Defense - Department of the Air Force | REMOVE AND REPLACE ELEVEN JANITORIAL CLOSET DOORS IN THE MOUNTAIN HOME AIR FORCE BASE YOUTH CENTER. | 55 219 USD | FIRM FIXED PRICE |
| 27/06/2022 | Department of Agriculture - Agricultural Research Service | MOD1 - ADDITIONAL WORK WITHIN SCOPE TO ADD NEW, LARGER VARIABLE FREQUENCY DRIVE (VFD) TO THE WELL PUMP FOR THE EVANS FARM IRRIGATION PUMP INSTALLATION AND WELL UPDATE. K.JENSEN | 14 723 USD | FIRM FIXED PRICE |
| 27/06/2022 | Department of Agriculture - Forest Service | GAOA ANTELOPE FLAT CAMPGROUND WATERLINE REPLACEMENT 4CK PROJECT - REPLACE WATERLINE AND VALVES BETWEEN THE EXISTING WELL AND STORAGE TANK | 145 253 USD | FIRM FIXED PRICE |
| 06/06/2022 | Department of Agriculture - Forest Service | THE WORK SHALL REPLACE SEVERAL ROOFS ON BOTH ADMINISTRATIVE AND QUARTERS BUILDINGS ON COCONINO AND KAIBAB FORESTS. | 20 906 USD | FIRM FIXED PRICE |
| 03/06/2022 | Department of Agriculture - Agricultural Research Service | LOGAN, UT. LABOR AND ANCILLARY MATERIALS TO INSTALL GOV OWNED EQUIPMENT FOR EVANS FARM IRRIGATION PUMP INSTALLATION AND WELL UPDATES. K.JENSEN | 14 126 USD | FIRM FIXED PRICE |
| 21/04/2022 | Department of Transportation - Federal Aviation Administration | MODIFICATION P00005 ISSUED TO INSTALL SOD AND OTHER IRRIGATION TASKS. ALL OTHER WORK TO BE PERFORMED IN ACCORDANCE WITH THE SCOPE OF WORK.THIS CHANGE ALLOWS FOR 5 ADDTIONAL CALENDAR DAYS TO THE CONTRA... | 24 871 USD | FIRM FIXED PRICE |
| 12/04/2022 | Department of Transportation - Federal Aviation Administration | SEWER LINE REPAIR AT THE SALT LAKE CITY ARTCC, SALT LAKE CITY, UT | 58 045 USD | FIRM FIXED PRICE |
| 12/04/2022 | Department of Transportation - Federal Aviation Administration | BLANKET ORDERING AGREEMENT (BOA) FOR THE AIR ROUTE TRAFFIC CONTROL CENTER, SALT LAKE CITY, UTAH AND CCF | 0 USD | FIRM FIXED PRICE |
| 30/03/2022 | Department of Transportation - Federal Aviation Administration | BLANKET ORDERING AGREEMENT (BOA) FOR THE AIR ROUTE TRAFFIC CONTROL CENTER, SALT LAKE CITY, UTAH AND CCF | 0 USD | FIRM FIXED PRICE |
| 17/03/2022 | Department of Transportation - Federal Aviation Administration | ADD FUNDING TO CHANGE THE ORIGINAL WALKWAY DESIGN FROM DECOMPOSED GRANITE TO ASPHALT FOR THE ZLC IRRIGATION SYSTEM MODERNIZATION. | 20 000 USD | FIRM FIXED PRICE |
Bekijk de officiele bron (DECP - data.economie.gouv.fr) (USAS)